The terminal is currently operating at 60% effective level mover the one berth with two day shifts and no night shift.
Transnet Port Terminals has advised that Port Elizabeth Bulk Ore Terminal (PEBOT) will shut to shipping between 4 and 10 July 2020.
The terminal is currently operating at 60% effective level mover the one berth with two day shifts and no night shift.